please enter please select

Energetics Based Tubing Cutter

Project Summary

NZTC are working with SPEX and Total Energies UK to develop a technology that removes large sections of casing and any associated cement back to the formation to allow the installation of a permanent barrier for well P&A. The technique may also have applicability for cutting windows for sidetracks and slot recovery.


OUTCOMES

Prometheus has the potential to drastically reduce time taken to P&A a well by cutting casing in-situ in a single trip, avoiding the need to recover any casing which will significantly reduce cost and CO2 emissions.

Let's work together

"Required" indicates required fields

My name isRequired
My name is
This field is for validation purposes and should be left unchanged.